Chapter 12 
Canard Installation
 
6/17/07

For this project, I decided to deviate from plans a bit.   The Plans have you floxing and a couple of studs into the top longerons, which requires   You to kind of tip the canard down into its space. Cumbersome, at best

At left, is a shot of the starboard AN3 bold protruding. The nutplate has not been installed yet.

PREV   HOME   NEXTChapter_11_Elevator_Construction.htmlHome.htmlChapter_13_Nose_Gear.htmlshapeimage_3_link_0shapeimage_3_link_1shapeimage_3_link_2